• Archived RFP's

    3/8/21 Shelburne Community School - Kitchen Renovation Project
    The Champlain Valley School District invites qualified GC's and qualified subcontractors to bid on the Kitchen Renovation Project. Please see the attached document
    3/1/21 Allen Brook School - Partial Roof Replacement
    The Champlain Valley School District invites you to submit a proposal for a partial roof replacement at Allen Brook School. The project outline and specifications for the above-referenced project are contained in this packet.

    2/11/21  Champlain Valley Union High School - Field Drainage Project
    The Champlain Valley School District invites you to submit a proposal for installing field drainage at Champlain Valley Union High School. The project outline and specifications for the above-referenced project are contained in this packet.
     
    2/11/21  Champlain Valley Union High School - Track Resurfacing
    The Champlain Valley School District invites you to submit a proposal for resurfacing the Running Track at Champlain Valley Union High School.  The project outline and specifications for the above-referenced project are contained in this packet.

    2/10/21  Shelburne Community School
    The Champlain Valley School District invites you to submit a proposal for paving the West Parking Lot off school Street at the Shelburne Community School. The project outline and specifications for the
    above referenced project is contained in this packet and attached drawings.
     
    1/27/21  Legal Notice - Charlotte Central School RFP - Pre Qualification For Construstruction Manager / Contractor
     
    2/01/21  Charlotte Central School - Request for Statement of Qualifications for CONSTRUCTION MANAGEMENT SERVICES
    The Champlain Valley School District (the “District”) is seeking letters of interest and Statements of Qualifications (SOQ) from qualified Construction Management firms to provide Construction Management - Constructor (“CM/C”) services for a renovation project at Charlotte Central School, Charlotte, Vermont.
    2/4/21  Charlotte Central School - Paving Project 

    1/21/21 Hinesburg Community School - 2nd-floor Dehumidification
    The Champlain Valley School District invites you to submit a proposal for Replacing the existing air handler known as AHU-2 with a new unit that provides dehumidification at the Hinesburg Community School. The project outline and specifications for the above-referenced project are contained in this packet.

    Project Manual
    Scope of Work

    1/19/21  Hinesburg Community School - Circulator pump replacement project
    The Champlain Valley School District invites you to submit a proposal for replacing 7 circulator pumps at Hinesburg Community School. The project outline and specifications for the above-referenced project are contained in this packet.

    Project Manual

    2/11/21 Hinesburg Community School - Window Replacement Project
    The Champlain Valley School District invites you to submit a proposal for a Window Replacement Project at Hinesburg Comunity School. The project outline and specifications for the above-referenced project are contained in this packet.
     

    The Champlain Valley School District invites you to submit a proposal for Williston Schools Snow and Ice Removal. The project outline and specifications for the above-referenced project are contained in this packet.

    Project Manual

    Project Maps

    The Champlain Valley School District invites you to submit a proposal for CVU Field A Drainage project. The project outline and specifications for the above-referenced project are contained in this packet.

    Project Manual

    Project Drawings


    The Champlain Valley School District invites you to submit a proposal for Allen Brook School Masonry Wall and Roofing project. The project outline and specifications for the above-referenced project are contained in this packet.

    Project Manual

    Bid Drawings

    Addendum 1


    The Champlain Valley School District invites you to submit a proposal for Hinesburg Community School Parking and Sidewalk Improvements.  The project outline and specifications for the above-referenced project are contained in this packet.

    Project Manual

    Plans and Specs

    The Champlain Valley School District invites you to submit a proposal for installing an RTU at Champlain Valley Union High School. The project outline and specifications for the above-referenced project are contained in this packet

    Project Manual

    Scope of Work


    The Champlain Valley School District will accept electronic bid proposals for the purchase of one 30 passenger bus with two wheelchair stations for our school district that meet Federal Motor Vehicle Safety Standards (FMVSS); requirements of the State of Vermont and requirements of the National School Transportation Specifications and Procedures in effect on date of manufacture. All other specifications are attached.

    Request For School Bus Proposals Specifications


    The Champlain Valley School District invites you to submit a proposal for the Williston School District Security Glazing project. The project outline and specifications for the above-referenced project are contained in this packet. 

    Project Manual


    The Champlain Valley School District invites you to submit a proposal for the 1998 2nd Floor Dehumidification at Hinesburg Community School. The project outline and specifications for the above-referenced project are contained in this packet. 

    Scope of Work

    Project Manual


    The Champlain Valley School District invites you to submit a proposal for Gymnasium Bleacher Seats at Champlain Valley Union High School. The project outline and specifications for the above-referenced project are contained in this packet. 

    Invitation to Bid and Bid Form


    The Champlain Valley School District invites you to submit a proposal for Sidewalk Replacement Charlotte Central School & Shelburne Community School. The project outline and specifications for the above referenced project are contained in this packet.

    Project Manual- Sidewalk Replacement

    Map View of Project

    The Champlain Valley School District invites you to submit a proposal for Kitchen Ventilation Upgrade at Hinesburg Community School. The project outline and specifications for the above referenced project are contained in this packet.

    Kitchen Air Handler Replacement

    HCS Kitchen Ventilation Upgrade March 9, 2020 BIDDING SCOPE OF WORK


    The Champlain Valley School District invites you to submit a proposal for replacing Doors and Hardware. The project outline and specifications for the above referenced project are contained in this packet.

    Addendum #1 Doors

    Project Manual

    Door and Door Hardware Bid Sheet


    The Champlain Valley School District invites you to submit a proposal to supply and set up classroom furniture.  The project outline and specifications for the above referenced project are contained in this packet.

    Project Manual

    Furniture Bid Sheet


    The Champlain Valley School District is requesting formal bid proposals for Hinesburg Community School Re-Roofing.

     Scope of Work

    EPDN Roofing

    ATC Work Plan

    Project Manual

    KCE Roof Evaluation 


    The Champlain Valley School District invites you to submit a proposal for the removal and replacement of our Gym folding wall. The project outline and specifications for the above referenced project are contained in this packet.

    Shelburne Gym Folding Wall Removal


    The Champlain Valley School District invites you to submit a proposal for the replacement of the Building well water line. The project outline and specifications for the above referenced project are contained in this packet.

    Charlotte Water Line Replacement RFP


     The Champlain Valley School District invites you to submit a proposal for the removal and replacement of the Underground Storage Tank ( #2 Fuel Oil) The project outline and specifications for the above referenced project are contained in this packet.

    Charlotte Underground Storage Tank Removal and Replacement


    The Champlain Valley School District invites you to submit a proposal for the removal and replacement of sidewalks at each school. The project outline and specifications for the above referenced project are contained in this packet.

    Charlotte and Shelburne Sidewalk Replacement


    The Champlain Valley School District, is requesting formal bid proposals from the suppliers of Number 2 heating oil for the period beginning July 1st, 2019 through June 30th, 2020.

    CVSD NUMBER TWO FUEL OIL BID for 2019-2020


    The Champlain Valley School District invites you to submit a proposal for the East Entry Stair and ADA Ramp Renovation. The project outline and specifications for the above referenced project are contained in this packet along with attachments.

    CCS East Entry Stair and ADA Ramp Renovation 

    CCS BidSet