• Archived RFP's

    The Champlain Valley School District invites you to submit a proposal for the removal and replacement of our Gym folding wall. The project outline and specifications for the above referenced project are contained in this packet.

    Shelburne Gym Folding Wall Removal


    The Champlain Valley School District invites you to submit a proposal for the replacement of the Building well water line. The project outline and specifications for the above referenced project are contained in this packet.

    Charlotte Water Line Replacement RFP


     The Champlain Valley School District invites you to submit a proposal for the removal and replacement of the Underground Storage Tank ( #2 Fuel Oil) The project outline and specifications for the above referenced project are contained in this packet.

    Charlotte Underground Storage Tank Removal and Replacement


    The Champlain Valley School District invites you to submit a proposal for the removal and replacement of sidewalks at each school. The project outline and specifications for the above referenced project are contained in this packet.

    Charlotte and Shelburne Sidewalk Replacement


    The Champlain Valley School District, is requesting formal bid proposals from the suppliers of Number 2 heating oil for the period beginning July 1st, 2019 through June 30th, 2020.

    CVSD NUMBER TWO FUEL OIL BID for 2019-2020


    The Champlain Valley School District invites you to submit a proposal for the East Entry Stair and ADA Ramp Renovation. The project outline and specifications for the above referenced project are contained in this packet along with attachments.

    CCS East Entry Stair and ADA Ramp Renovation 

    CCS BidSet